Skip to main content
Booking Edmonton driveways and parking lots for the current paving season.
(613) 324-9141

Access first

Paving in St. Albert, access checked first

The thing that most often costs a day on a job in St. Albert is not the surface. It is machinery arriving to find it cannot get where the work is, which is a question worth answering before a date exists.

  • Access measured at the quote
  • Hand work priced, not hidden
  • No surprises on the day

What gets checked

The access questions we settle in St. Albert before booking

How wide the entrance is, and whether a paver can pass through it or has to work from outside. That single measurement decides how much of the job is machine work and how much is done by hand.

Where material can be dropped, and how far it then has to be moved. Hot asphalt has a working window, so distance from the drop to the work is a real constraint rather than an inconvenience.

And what is overhead or shared. Low branches, wires and a neighbour's right of way all change the plan, which is why boundaries come up at the quote, the drive itself is priced after that, and access appears in the figure rather than arriving later.

Measured gate
A narrow side gate being measured for machine access in St. Albert
Asphalt being moved by hand from the drop point to the work

The access survey

How your St. Albert access check works

  1. Measure the entrance

    The narrowest point, not the gate posts. A few inches decides whether a machine passes or the job becomes largely hand work.

  2. Find the drop point

    Where a truck can stand and how far material then travels. This sets how the day is staffed as much as the area does.

  3. Look up and sideways

    Branches, wires, and anything shared with a neighbour. All three have stopped jobs that looked straightforward on paper.

  4. Price it as it is

    If a drive needs hand work, that goes on the quote as hand work rather than being absorbed and then rushed on the day.

What it changes

What tight access changes for your St. Albert drive

Mostly the labour, not the specification. A hand-laid drive is built to the same depth and compacted properly; it simply takes longer and needs more people, and that belongs in the price honestly.

It can change the sequence too. Where a machine cannot reach, removal and base work may happen in sections rather than all at once, which occasionally extends a one-day job into two.

What it should never change is the build. The base gets the same treatment, the fall is still designed, and a quote that stays silent on access is one worth asking about before you accept it.

A hand-laid driveway section being compacted to full depth
The labour Changes
The sequence Can change
The build Never

What we do here

Paving work across St. Albert

All quoted after the access check.

All Service Areas

Common questions

What St. Albert owners ask

Because it decides how much of the job a machine can do. A drive a paver can run on lays faster than one reached through a gate, where more of the work is done by hand.
Yes, and to the same depth. It takes longer and needs more people, which is why it belongs on the quote as hand work rather than being absorbed and rushed.
It needs a conversation with the neighbour and a look at where the boundary actually sits, since the fence and the kerb are both unreliable guides to the surveyed line.
Not usually, but they change the plan and are far better found at the quote than on the morning. Both have stopped work that looked perfectly straightforward on a drawing.
Sometimes. Where machinery cannot reach, removal and base work may run in sections, and we would rather tell you that at the quote than halfway through the first day.
No. The depths and the compaction are the same; what changes is how long it takes and how many people are needed to keep the material within its working window.

Customer reviews

What Edmonton customers say

★★★★★ 4.9 · 127 reviews on Google
Read all reviews →
★★★★★

They checked truck access to our St. Albert lot before quoting and planned the delivery around the narrow lane. No surprises on the day.

Greg T.
St. Albert
★★★★

Driveway in St. Albert replaced in one day with the base compacted in lifts. Two winters without a crack.

Aisha K.
St. Albert
★★★★★

Commercial lot in St. Albert repaved in phases around the tenants. Lines back the next morning.

Ravi L.
St. Albert
★★★★★

The St. Albert crew swept the street and hosed the sidewalk before leaving. Tidy.

Cara J.
St. Albert

From the blog

Reading for St. Albert owners

All Paving Guides
Why Edmonton Driveways Fail at the Apron First Driveway Paving

October 26, 2026 8 min read

Why Edmonton Driveways Fail at the Apron First

The apron cracks first because the base under it was never compacted properly. This is not a surface problem. It is a foundation problem, and it decides whether resurfacing will hold.

Read article
Spring Potholes in Edmonton: Why Fall Prevention Matters Asphalt Repair

October 26, 2026 11 min read

Spring Potholes in Edmonton: Why Fall Prevention Matters

Every April, Edmonton's potholes reappear. They did not form overnight. They started as open cracks the previous fall, filled with water, and shattered when the freeze-thaw cycle began. The repair you avoid in October becomes the pothole you cannot avoid in spring.

Read article
Sealcoating Your Edmonton Driveway Before Winter Arrives Sealcoating

October 26, 2026 12 min read

Sealcoating Your Edmonton Driveway Before Winter Arrives

The autumn window for sealcoating closes fast in Edmonton. A sealed surface resists salt damage and plough wear on edges. Here's when to act and what changes if you wait.

Read article

Next step

Get your St. Albert drive checked for access and quoted

We will measure the entrance, the drop point and anything overhead, then quote the work with the hand labour shown as its own consideration rather than hidden.

Shared drives are worth mentioning when you call.