Two drives of identical size can be quoted a long way apart for entirely legitimate reasons. Knowing which reasons those are is what lets you tell a thorough quote from an expensive one.
Five real variables
Area is the obvious one and the least interesting, because it is the variable everybody already checks. The ones that move a number without being noticed are access, removal, depth and the state of the ground.
Access decides what machinery can reach the work. A drive a paver can run on directly costs less to lay than one reached through a narrow side gate, where more of the job is done by hand and takes longer.
Removal is its own line. An existing surface has to come out and go somewhere, and a thick old build generates more material than a thin one. Taking it out is quoted separately from laying the new one, and what the base needs is the item most likely to change the figure once it is open.
Reading a quote
Quotes written off a satellite image and quotes written on site routinely differ. Compare the stated area before comparing anything else.
Asphalt depth and base depth are the specification. A lower number with a thinner build is a different product rather than a better deal.
If the old surface is coming out, that work and the material leaving site should appear as their own items rather than being folded invisibly into a total.
This is the common cause of a mid-job change. A quote that states how extra base work would be handled is more useful than one that is silent on it.
What you can change
Some of the inputs are fixed by the property. Access, existing build and ground conditions are what they are, and no amount of shopping around changes them, though it does change who tells you about them.
Scope is where the real choice sits. Widening the drive, extending it, adding an apron or correcting drainage are each decisions with a price attached, and they are easy to confuse with the cost of the paving itself.
Timing has some effect too. A drive booked into a sensible part of the season runs more smoothly than one squeezed against the weather. Making it bigger, fixing how it drains and the full variable list are worth separating from the surface before you compare anything.
Related reading
The items most often folded into a single number.
The full list of variables, each with the direction it pushes a number and whether you can do anything about it.
Learn moreWhether the existing drive needs replacing at all, which is the question worth settling before anyone prices anything.
Learn moreThe layer under the asphalt and the usual reason a job costs more than the first figure suggested.
Learn moreThe much smaller recurring number, and what it protects once the new surface is down.
Learn moreCommon questions
Quote was priced per square foot with the base work as a separate line. When the old base turned out solid, that line came off the bill.
They explained why a driveway on clay costs more than one on gravel before I signed. The number made sense once the reason was clear.
Three quotes and theirs was the only one that listed the asphalt depth. The others were just a total.
Final invoice landed inside the range they gave at the first visit.
From the blog
Next step
We will measure the drive, look at access and the ground, and give you a quote that states depths and separates removal so you can compare it with anything else.
How extra base work would be priced is agreed before we start.