Driveway paving
A residential driveway is a one-day job when the base is sound and a two-day job when it is not. Which one you have is decided at the site visit, not after the machine arrives.
What the day looks like
The old surface comes up first and goes away the same morning. What is underneath is then graded and compacted, and any soft area is dug out rather than paved over, which is the step that decides whether you are buying ten years or two.
Hot mix arrives at temperature and has to be laid and rolled before it cools, so the surface goes down in a continuous sequence rather than in stages. The order of the day is set out in full on its own page.
Edges get hand attention because a roller cannot reach them. An unsupported edge crumbles first and takes the surface with it, which is why edge repair is such a common call on drives that were paved cheaply. If your base is already sound, resurfacing does this for less.
How it runs
The drive is measured on site including the apron and the turn at the garage, because those add area that a satellite image flattens out of the picture.
Existing asphalt is broken out and removed the same morning, which exposes the base and shows up any soft ground that was hidden under it.
Granular material is levelled to the finished slope and compacted in layers. Soft spots are dug out and replaced before anything goes over them.
Asphalt goes down hot and is rolled in passes until the density is right, then the edges are worked by hand where the roller cannot reach them.
What moves the price
Area is the obvious one and the least interesting. Two drives of identical size can be far apart because one needs its base rebuilt and the other does not, and that is the line to compare between quotes.
Compacted depth is the second. A drive that only carries cars is not built like one a truck turns on, and the depth should be written down rather than described as standard.
Access is the third and it is often missed. A machine that can reach the whole area works quickly; one that cannot means hand work around posts, steps and tight corners, and that time has to be in the number. The full list is here, and what a quote should contain is worth reading before you compare any of them.
Related work
What people usually book alongside a new driveway.
Adding width for a second vehicle while the machine is already on site, which is far cheaper than bringing one back for it later.
Learn moreIf the base turns out to be sound, a bonded layer over the top achieves the same look without the removal and disposal.
Learn moreThe granular work underneath, priced separately so you can see what the ground is costing you rather than the asphalt.
Learn moreBooked six to twelve months later, once the new surface has released its oils and is ready to take a coat.
Learn moreCommon questions
New driveway from excavation to final roll in one day. The base was compacted in two lifts and the asphalt is three inches thick, as quoted.
They graded it to drain toward the street and away from the garage. No more puddle by the door.
The edges were hand-tamped and the apron was blended into the road. Looks like it was always there.
Three years on, no cracks, no settling. The base work was the difference.
From the blog
Next step
Twenty minutes on site gives you the area, the compacted depth, the base work and the disposal as separate figures, plus an honest answer on whether resurfacing would do.
If the base is sound you will be told, and the cheaper option quoted alongside.