Paving day
Most of the anxiety about a paving job comes from not knowing the shape of the day. It is noisy, it is quick once it starts, and almost all the decisions were made before anyone arrived.
The shape of it
The crew arrives early because asphalt has to be laid hot, and the delivery schedule works backwards from that. Expect machinery on site before most people would call it a reasonable hour.
Removal and base work take the bulk of the day. The old surface comes up, the ground underneath is graded and compacted, and any soft areas are dealt with. This is the part that decides how long the result lasts.
Laying itself is fast and it is the part people watch. Hot material is spread, levelled and then compacted while it is still workable, which is why a driveway often finishes in one day, the base is the real work, and curing starts the moment the roller stops.
Before the day
Including the one you were going to move later. Nothing can stay on the surface and nothing can be parked where the delivery has to reach.
Gates unlocked, bins moved and overhanging branches noted. Machinery needs more room than a car does to get where it is going.
Pots, ornaments and anything light enough to move. There is vibration from compaction and there is dust from removal.
The surface will not take a vehicle the same evening. Knowing where the car goes saves the one decision people always leave until it is dark.
During and after
It is loud and it smells. Compaction equipment carries noise further than you expect and hot asphalt has a strong smell for a few hours, which is worth mentioning to anyone next door beforehand.
There will be a moment that looks wrong and usually is not. A surface part-laid, an edge not yet cut in or a joint that looks rough all get resolved before the crew finishes, so it is worth asking rather than worrying.
The handover is the part to pay attention to. Return times, what the first season will look like and what is covered all get explained then, and when the first coat is due is a question worth asking before anybody leaves.
Related reading
What sits either side of it.
What happens once the roller stops, and which first-year marks are normal.
Learn moreThe part of the day that takes longest and decides how long the result lasts.
Learn moreWhat has to be settled before the day happens at all.
Learn moreThe job itself, start to finish, including what is quoted separately.
Learn moreCommon questions
The crew arrived at seven, the old driveway was out by nine, the base was compacted by noon and the asphalt was down by three. Exactly as the guide said.
They told me when to move the cars, when I could walk on it and when I could drive on it. All three times held.
The guide on their site described the day step by step. The actual day matched it.
Rolled twice, edges hand-tamped, and the crew swept the street before leaving.
From the blog
Next step
We will tell you when we arrive, what the day sounds like, what you need to move and when you can park on it again, before you commit to anything.
Ask anything at handover; that is what it is for.