Driveways
Lots and larger areas
Surface damage
Structural
Is it worth repairing
Crack work and materials
Timing and cost
Who we work for
Planning and budget
About us
There is not much to say about a paving company that a quote does not say better. So this page is about how we quote, what we write down, and the work we turn away.
How we quote
The area, measured on site rather than estimated from a satellite image. People underestimate drives consistently, and an area that is wrong makes every figure built on it wrong by the same proportion.
The build, written as asphalt depth and base depth. That is the number that decides what you are buying, and a quote without it cannot be compared with another quote.
And the exclusions, listed. Removal, disposal, drainage correction and markings are the items most often left out of a figure, so what moves a price is written down, the questions to ask us are published, and whether you need the work comes first.
How we work
The cracking pattern, where water goes and what access allows. Three things that decide the job and none of them visible from a phone call.
Sometimes the answer is maintenance, or nothing yet. That gets said even though the larger job would be the bigger invoice.
Preparation takes most of the day because it decides how long the surface lasts. Shortening it is the easiest way to make a job look fine and fail early.
Return times, what the first season looks like, and when coating would be due. Explained before the crew leaves rather than left to look up.
What we decline
Coating a surface that has broken into connected pieces. It looks better for part of a season and the money is gone, so that gets said at the visit rather than after the invoice.
Replacing a surface that only needs repairs. A sound base with scattered defects gets years from patching, and spending a large sum there buys very little.
And anything that is not asphalt. Decorative finishes, colour and stamped patterns are things concrete does and asphalt does not, the end-of-life signs are published so you can check our reasoning, and coating too often is something we argue against.
What we do
Residential and commercial, quoted the same way.
New and replacement residential surfaces, measured on site with the build written on the quote.
Learn moreCommercial surfaces phased so the property keeps trading, with the staging priced openly.
Learn morePotholes, cracks, edges and settled areas, usually combined into one visit where that is better value.
Learn moreCoating on a sensible interval, with the preparation that decides whether it holds at all.
Learn moreCommon questions
They cored the old driveway before quoting and showed me two inches of asphalt over clay. The quote was built on what was under it, not on the square footage alone.
First paving company that told me my driveway had five years left and offered crack sealing instead of a replacement. That honesty won the job when it was finally time.
The estimator measured with a wheel, marked the grade with paint and explained the drainage before any number came out. The invoice matched the sketch.
Same crew on every job we have given them. The foreman knows our lot and the quote never drifts between the estimate and the bill.
From the blog
Driveway Paving
The apron cracks first because the base under it was never compacted properly. This is not a surface problem. It is a foundation problem, and it decides whether resurfacing will hold.
Read article
Asphalt Repair
Every April, Edmonton's potholes reappear. They did not form overnight. They started as open cracks the previous fall, filled with water, and shattered when the freeze-thaw cycle began. The repair you avoid in October becomes the pothole you cannot avoid in spring.
Read article
Sealcoating
The autumn window for sealcoating closes fast in Edmonton. A sealed surface resists salt damage and plough wear on edges. Here's when to act and what changes if you wait.
Read articleNext step
We will measure the surface, read the cracking pattern, and tell you whether the work is needed before telling you what it costs.
If maintenance is the better answer, that is what you will hear.