A commercial surface in Beaumont is a scheduling problem before it is a surface one. The question is never only what to build, it is how to build it while the property keeps working.
Staging first
The sequence is drawn before anything is priced, because it changes the price. How many phases a site needs, whether they run at night, and how much has to stay open all cost real money and all belong to the property rather than to us.
Access points get worked in halves rather than closed. A lot that reads as shut from the road loses trade whatever the signs say, and that cost never appears on a quote but is paid by the tenants.
Then the usual constraints get named: deliveries, bin routes and accessible spaces. Retail sites and yards have different versions of this, and accessible provision has to work in every phase rather than most of them.
How a site runs
The whole site walked and photographed, including service routes and the areas nobody mentions until they are closed off.
Which section closes when, and whether it runs overnight. Settled with the site before booking rather than with a crew on the morning.
Entrances in halves, barriers and signs in place, and the route in maintained throughout rather than restored at the end of the day.
Each phase swept, signed and recorded, so the property has evidence of what was done and not simply an invoice.
What it costs you
Phasing is not free and it should not be invisible. Each phase is a separate mobilisation and barrier set, often a separate night, so a site that stays open costs more than the same site closed for a continuous period.
That trade is the property's to make, which is why it is worth having priced both ways. Sometimes a longer closure of one section is cheaper and less disruptive than six short ones.
The honest saving is usually elsewhere anyway. Ranking zones and deferring the sound ones lowers this year without thinning the build, the figures show where that works, and boards usually need it split that way to approve anything.
What we do here
Scoped as separate lines so part can be approved.
Surface work phased so the property never reads as closed from the road.
Learn moreCoating staged section by section, with markings following once everything has cured.
Learn moreScope written for a board, with deferrable items marked and a record of each visit.
Learn moreZones ranked by condition and spread across budget years rather than landing in one.
Learn moreCommon questions
Plaza lot in Beaumont repaved at night around the store hours. Tenants never closed.
They staged our Beaumont warehouse yard so receiving kept running. Heavier spec under the truck lanes.
Condo lot in Beaumont done in three phases with a notice schedule for the residents.
Our Beaumont plaza was sealed and re-striped over a single weekend and the tenants opened Monday to a finished lot and one invoice.
From the blog
Driveway Paving
The apron cracks first because the base under it was never compacted properly. This is not a surface problem. It is a foundation problem, and it decides whether resurfacing will hold.
Read article
Asphalt Repair
Every April, Edmonton's potholes reappear. They did not form overnight. They started as open cracks the previous fall, filled with water, and shattered when the freeze-thaw cycle began. The repair you avoid in October becomes the pothole you cannot avoid in spring.
Read article
Sealcoating
The autumn window for sealcoating closes fast in Edmonton. A sealed surface resists salt damage and plough wear on edges. Here's when to act and what changes if you wait.
Read articleNext step
We will walk the site, record its condition, and propose a phase plan priced both ways so you can see what keeping the property open costs.
Scope is written as separate lines so part of it can be approved.