Excavation, base
Almost every asphalt failure is a base failure wearing a surface. This is the part of a paving job nobody sees and the part that decides whether the visible half lasts ten years or two.
The invisible half
The granular layer spreads the weight of a vehicle over a wider area of ground and gives water somewhere to drain. When it is compacted properly it does both for decades. When it is not, it moves under load and the asphalt above it has nothing to sit on.
Compaction happens in layers for a reason. Material dumped to full depth and rolled once is dense at the top and loose underneath, and the loose part is what settles later. Thin lifts compacted in turn is slower and is what a base line on a quote is actually paying for.
Soft spots have to come out rather than be bridged. Paving over wet or organic ground buys one season, and the result is the sunken section that brings people back. Where that has already happened, replacement is what fixes it.
How base work runs
Excavation depth is set by what the surface will carry, so a lot taking delivery trucks comes out deeper than a drive carrying two cars.
Wet clay, organic material and old fill are taken out rather than compacted, because none of them gains strength no matter how many passes a roller makes.
Granular is placed in thin layers and each one is compacted before the next goes down, which is what produces density the whole way through.
The surface of the base is shaped to the fall the finished asphalt needs, because drainage is set here and cannot be corrected by the layer above.
Where it shows up
Base problems announce themselves in three ways. Areas that sink, cracking that has joined into a network, and water that stands after rain. All three mean the same thing: the layer below has moved or was never dense enough.
Timing is the clue. A surface that failed within a few seasons of being laid almost always had a base problem from the start, while one that lasted fifteen years has simply reached the end. The normal lifespan is a useful comparison.
Water accelerates everything. Where drainage was never set correctly, the fall has to be fixed as part of any base work, or the new layer is on the same schedule as the old one. A winter does the rest.
Related work
Base preparation is rarely bought on its own.
The surface that goes over it. Depth and base are quoted as separate lines so you can see what each is costing.
Learn moreHow much fall a surface needs and why the slope set in the base cannot be corrected later.
Learn moreWhat a base failure looks like once it has happened, and what putting it right involves.
Learn moreWhere the base has gone across most of a surface, rebuilding it means taking the asphalt off first.
Learn moreCommon questions
They dug out the old driveway and the clay underneath, then built the base in compacted lifts. Showed me the plate compactor readings.
The base depth was on the quote and I measured it before the asphalt went down. It matched.
They found a soft spot during excavation and added depth there without a change order argument.
Proper base work is why the new driveway has not moved. They explained that on the first visit and it has proven true.
From the blog
Next step
The cracking pattern, the way water drains and the history of repairs tell us most of it before anything is dug. You get that read, and what acting on it would cost.
Base work is quoted as its own line rather than folded into a total.