Driveways
Lots and larger areas
Surface damage
Structural
Is it worth repairing
Crack work and materials
Timing and cost
Who we work for
Planning and budget
Where we work
Six areas, one crew and one set of standards. What changes between them is access, travel and how far ahead a job needs booking, so each area has its own page saying what that means in practice.
What travel changes
Not the standard of the work and not the specification. The surface is built the same way at every address, because depth and compaction are not things that get adjusted for how far the truck drove that morning.
What distance changes is logistics. Material arrives hot and it has a working window, so a longer run means tighter scheduling and a stronger preference for grouping nearby jobs into the same day.
It also changes which small jobs make sense on their own. A single repair further out is usually combined with other work rather than refused, a maintenance cycle makes that easy to plan, and what moves a price explains where travel does and does not appear.
The six areas
Each page covers what is different about working there.
The base. Full range of work, shortest lead times, and the page to start on if you are in the city itself.
Learn moreDriveway work, and the access questions we settle before booking rather than discovering on the morning.
Learn moreHow the paving season and the booking calendar work, and what moves a confirmed date.
Learn moreQuoting: what can be told from a photograph and a measurement, and what needs somebody standing on it.
Learn moreCommercial and managed sites, phasing and after-hours work so a property keeps trading.
Learn moreRepairs and smaller jobs, and how visits get combined so a small job is still worth doing.
Learn moreCommon questions
We are at the edge of their area and they still came, on time, at the same price as in town.
They handle our house and our rental in different areas on one account. One contact, one standard.
Asked if they served our street before booking. They checked, said yes, and the crew arrived Thursday.
There was no travel surcharge on the invoice for the further property, which two other companies had quietly added after their quotes.
From the blog
Driveway Paving
The apron cracks first because the base under it was never compacted properly. This is not a surface problem. It is a foundation problem, and it decides whether resurfacing will hold.
Read article
Asphalt Repair
Every April, Edmonton's potholes reappear. They did not form overnight. They started as open cracks the previous fall, filled with water, and shattered when the freeze-thaw cycle began. The repair you avoid in October becomes the pothole you cannot avoid in spring.
Read article
Sealcoating
The autumn window for sealcoating closes fast in Edmonton. A sealed surface resists salt damage and plough wear on edges. Here's when to act and what changes if you wait.
Read articleNext step
Tell us where you are and what the surface is doing. We will say what the work involves, what access we need and a lead time we can hold.
Nearby addresses outside the six areas are worth asking about.