Lot paving cost
On a commercial lot the asphalt is often not the expensive part. Access, staging and how much of the site has to keep trading can move a figure further than the surface specification does.
Beyond the asphalt
Scale works in your favour on the surface itself. Larger areas lay more efficiently, so the rate per square metre on a big lot is normally better than on a small one, which is the part most people expect.
Staging works the other way. Every phase is a separate mobilisation, a separate set of barriers and often a separate night, so a lot that has to stay open costs more than the same lot closed for a week.
Then the build varies within the site. Truck aprons and turning areas need more than staff rows do, so a yard and a plaza price differently even at the same area. Drainage and base work are the items that sit under all of it.
Reading a quote
A single depth across a whole site is either over-built where cars park or under-built where trucks turn. Ask which areas were specified separately.
Phasing and night work are real costs and should be visible. A quote that assumes a full closure will look cheaper than one that keeps you trading.
Correcting where water goes is distinct work. Folded into a surface figure, it is impossible to tell whether it was priced or simply left out.
Striping, signage and wheel stops are separate items that come last. They are easy to leave out of a comparison and noticeable when they are missing.
Spending less, honestly
The honest savings are in scope and sequence, not in specification. Doing the failing zones now and the sound ones in a later year costs less this year without buying a thinner surface.
Closure is the other lever and it belongs to the site rather than the contractor. A property that can close a section for longer pays for fewer mobilisations, and that choice is worth pricing both ways before deciding.
What does not save money is thinning the build under heavy traffic. That failure arrives as settlement within a few seasons. A ranked plan is the structured version of spending less now, and the repair or replace call often removes half the scope on its own.
Related reading
The items that sit behind the rate.
Ranking zones and spreading them across years, which is the structured way to spend less in any single year.
Learn moreThe work itself, and how phasing and night shifts are built into a programme.
Learn moreWhat sits under the asphalt, and the reason a lot that was built thin settles at the turning areas.
Learn moreThe variable list in full, with the direction each one pushes a number.
Learn moreCommon questions
The lot was priced by area, with the truck lanes at a heavier spec listed separately. The board could see exactly where the money was going.
They explained that night work costs more and why, and let us choose. We chose it and the tenants never noticed the job.
Quote included the line marking and the catch basin adjustments. The last company added both after the fact.
The per-square-foot rate was the same on the invoice as on the estimate, and the square footage matched the drawing.
From the blog
Next step
We will survey the site, specify each area for what uses it, and price the phasing both ways so you can see what staying open is actually costing.
Markings and signage are quoted as separate items.