Permits and lines
Resurfacing what is already there rarely needs permission. Changing where the surface goes, how big it is, or how it meets the road can, and the boundary is usually closer to your house than people assume.
When consent applies
Replacing a surface with the same surface in the same place is the straightforward case. Nothing about the property changes, so in most places this is maintenance rather than something requiring an application.
Changing the footprint is where it shifts. Widening a drive, extending it, adding a second parking area or increasing how much of a lot is hard surface can all touch local rules, often because of how much water the property sheds afterwards.
Anything touching the road needs attention regardless. The apron where a drive meets the highway is commonly municipal rather than yours, making a drive bigger is the usual trigger, and where the extra water goes is usually the question behind the rule. On public sites the municipality is involved directly.
Before you commit
A survey or your title documents, not the fence and not the kerb. Both of those are frequently in the wrong place relative to the actual boundary.
The strip where the drive meets the road is often municipal. Work there may need permission even when the rest of the drive does not.
Same size in the same place is usually simple. More area, a new access point or a different shape may not be.
Whether the contractor handles the application or you do should be written down, because assuming the other party is doing it stops the job on the morning.
Where the line sits
Fences get rebuilt a little off. Kerbs and sidewalks were placed to a road allowance rather than to your title. Over decades the visible edges of a property drift away from the legal ones in both directions.
This matters most on a shared drive or a tight side passage, where a surface laid to the fence can end up over a neighbour's line. That is an expensive thing to discover after the asphalt is down and compacted.
The cheap version of this check is a conversation and a look at the documents before work starts. Widening, a full replacement and rebuilding an edge are the three jobs where the boundary comes up most often.
Related reading
The work most likely to need a check first.
Making a drive bigger, which is the usual reason a paving job needs permission at all.
Learn moreWhere the extra water goes, which is normally the question behind a hard surface rule.
Learn morePublic sites, where the municipality is a party to the work rather than a regulator of it.
Learn moreIncluding the question of who is responsible for arranging any permissions.
Learn moreCommon questions
They checked the property line and the curb cut permit before widening the driveway. The city had no issue.
The estimator flagged that a widening would need a permit and handled the application. I did not know it was required.
They marked the line between our lot and the neighbour's and kept the paving on our side. No dispute.
The permit was pulled and the inspection passed. Nothing for me to chase.
From the blog
Next step
Tell us whether the surface is staying the same size or changing. We will tell you what that means for permissions and who should be arranging them.
Requirements vary by municipality and are checked for your location.