Driveways
Lots and larger areas
Surface damage
Structural
Is it worth repairing
Crack work and materials
Timing and cost
Who we work for
Planning and budget
Hot rubber sealing
A crack is a moving joint. It opens in the cold and closes in the heat, every year, which is why the material put into it has to stretch rather than simply fill the gap and set hard.
Why rubber
Asphalt expands through summer and contracts through winter, and a crack is where that movement concentrates. A gap that measures five millimetres in August can be noticeably wider in January, every single year.
A rigid filler cannot follow that. It bonds, then splits at the first hard frost, and water is back in the base through a channel that now looks sealed from above. Rubberised sealant is engineered to elongate instead of fracturing.
Routing is the other half. Cutting the crack to a consistent channel gives the sealant depth to sit in and a clean face to grip, rather than a thin smear across the top. The lighter version suits narrow residential cracks, and any coat goes on afterwards rather than before. Where cracks have joined up, sealing is no longer the answer.
How it runs
Wide and active cracks get a channel cut. Narrow stable ones are sealed without, and some are left because the surface around them is past the point of being worth it.
The crack is cut to an even width and depth so the sealant has a reservoir and two clean vertical faces to bond to rather than a dusty hairline.
Compressed air clears dust, grit and vegetation. Sealant that bonds to debris or to damp lifts out of the channel within a year.
Melted sealant is run in and levelled flush with the surface, setting hard enough for traffic within about an hour of application.
When to book it
Late summer into early autumn is the window. The surface is dry, cracks are at their narrowest after a season of heat, and the work is finished before the first freeze gets the chance to use anything still open.
Counter-intuitively, narrow is better for application. A crack at its widest in deep winter would take more material and then be compressed as the asphalt expands again, which pushes the sealant proud of the surface.
Deep winter is the one to avoid, because the channel cannot be dried properly and the bond fails. What a winter does to an open crack is the reason the autumn window matters, and on a lot this normally runs immediately before the coat as part of the same cycle.
Related work
Sealing is the step that makes everything after it worth paying for.
The lighter residential version for narrow stable cracks, where routing would take more off the surface than the crack justifies.
Learn moreThe coat that follows. Sealer poured over an unsealed crack sinks in and leaves a line that reopens within the season.
Learn moreWhere cracking has joined into a connected network, sealing each line achieves nothing and the section is cut out instead.
Learn moreWhat an open crack becomes over one winter, and why the autumn booking window is the one that matters.
Learn moreCommon questions
Cracks routed and sealed with hot rubber that flexes in winter. Two seasons on, the seal has not pulled out.
They explained why hot rubber lasts and the cold tube product does not. The difference was obvious by spring.
The crack sealing was done before the sealcoat, in the right order. The crew explained why.
The sealant was over-banded and finished flush with the surface, not left as a raised bead for the snow plow to catch and tear out.
From the blog
Sealcoating
The autumn window for sealcoating closes fast in Edmonton. A sealed surface resists salt damage and plough wear on edges. Here's when to act and what changes if you wait.
Read article
Sealcoating
Sealing too early traps the oils in new asphalt and sealing too late means the surface is already oxidised. What the interval actually depends on, why the first coat waits six to twelve months, and what a sealer can and cannot fix.
Read articleNext step
We will walk the surface, mark which cracks are worth routing and which are not, and give you a figure for the ones that will actually hold.
Crack sealing is quoted separately from any coating work.