Adding a strip for a second vehicle or extending to a side door is a small job with one hard part: the join. Everything else is ordinary paving, and the join is where these either last or fail.
All about the join
New asphalt laid against an old edge has nothing to bond to unless that edge is cut back to a clean vertical face. Butted against a crumbling edge it opens within a winter, and then water runs straight down the line into both bases.
So the existing surface is saw-cut, the new base is built to the same depth, and the seam is sealed once both sides are compacted. It is the same discipline as a full-depth patch and it is what separates a tidy job from a visible scar.
The second thing to settle is where your property actually ends. Widening towards the road or a neighbour can run into the road allowance, so that gets checked before anything is cut. A new strip also needs somewhere for water to go.
How it runs
Where the new edge will sit and which way water will run are settled first, including whether the strip stays inside your property.
The old surface is cut back to a clean vertical face so the new asphalt has something solid to be compacted against rather than a crumbling lip.
The new section is dug and built to the same depth as the existing surface, so the two sides settle at the same rate instead of parting over time.
Asphalt is laid, rolled and brought level with the old surface, and the joint is sealed so water cannot work its way into either base.
Worth doing together
The machinery, the crew and the delivery are the same whether a strip is added on its own or as part of a larger job. Doing both at once avoids paying twice for the mobilisation, which on a small strip can be most of the price.
It also removes the join problem entirely. If the whole surface is being laid at once, there is no seam between old and new asphalt to go wrong later.
Where the existing surface is sound and staying, the strip is matched to it as closely as fresh asphalt allows. It will be darker for a season, and a coat over both once the new section has cured is what evens the colour out. The wait before that coat applies to the new strip only.
Related work
Usually quoted together because the crew is already there.
Doing the whole surface at once removes the seam and usually costs less per square metre than the strip on its own.
Learn moreThe new section needs its base built to the same depth, or the two halves will settle at different rates.
Learn moreWhere your land ends and when work near the road allowance needs permission before it starts.
Learn moreA coat over old and new together once the extension has cured, which is what evens out the colour difference.
Learn moreCommon questions
Widened the driveway by four feet for a second car. The join between old and new is barely visible and the grade matches.
They checked the curb cut rules and handled the permit before widening. The city inspector signed off.
The extension was built on the same base depth as the original so it will not settle differently.
Turnaround added beside the garage, graded to drain with the rest. Exactly what we asked for.
From the blog
Next step
We will check where your property ends, how the water will run, and what the strip costs on its own against what it costs combined with other work.
Combining it with a larger job usually removes the seam and lowers the price.