Driveways
Lots and larger areas
Surface damage
Structural
Is it worth repairing
Crack work and materials
Timing and cost
Who we work for
Planning and budget
Lot sealcoating
Lots age faster than driveways and for a different reason. It is not weather doing the damage, it is fuel and hydraulic drips softening the binder in the places vehicles sit and turn.
Why lots differ
Petrol, diesel and hydraulic fluid dissolve the binder that holds asphalt together. A lot collects all three in concentrated spots, so the damage is chemical and local rather than gradual and even across the surface.
That changes where the work goes. Bin pads, loading areas and the bays nearest a service door get attention the far rows do not need, and those zones are degreased before any sealer reaches them.
It also shortens the interval. A residential drive runs comfortably on a two to three year cycle; a busy lot often does not. A planned cycle is how most sites handle that, and larger sites fold it into a longer plan.
How a lot runs
Which sections close when, and whether work runs overnight. Settled with the site before booking rather than with a crew on the morning.
The section is swept clear, drip zones are degreased, and open cracks are filled before anything is coated over them.
Sealer is applied and the area is coned and signed so nobody drives onto it, which on an open site is most of the work of getting a clean finish.
The section returns to use once cured and the lines go on at the end, after every coating operation on the site is finished.
Keeping trade running
Almost no lot can close completely, so the site is split and the sequence published in advance. Customers and staff always have somewhere to go, and the entrance is coated in halves rather than shut.
Retail runs overnight because the trading day is the constraint. Industrial yards work around shift changes and deliveries instead, and those schedules are different enough to be agreed separately.
The markings are last and they are the moment the lot stops looking neglected. A freshly coated surface with faded lines reads worse than before, so striping follows the coat and the layout can change while the lines are gone anyway.
Related work
Normally booked as one visit while the site is already staged.
The heavier crack work lots need, run before the coat so the sealant has something solid to sit in.
Learn moreFresh stalls and aisles once the coat has cured, which is what makes the work visible to anyone using the site.
Learn moreA set cycle of inspection, crack work and coating, which on a lot usually runs shorter than on a driveway.
Learn moreWhere coating has stopped being enough, what the surface work costs and how staging changes the figure.
Learn moreCommon questions
Lot sealed over a weekend in two halves so tenants always had parking. Lines repainted on Monday morning.
Oil spots primed before sealing so the sealer stuck. The last company skipped that and it peeled.
They cleaned the lot properly before sealing. The surface is even and the edges are sharp.
Sealcoat on Saturday, striping on Sunday, one invoice on Monday. The schedule they gave the tenants was the schedule they kept.
From the blog
Sealcoating
The autumn window for sealcoating closes fast in Edmonton. A sealed surface resists salt damage and plough wear on edges. Here's when to act and what changes if you wait.
Read article
Sealcoating
Sealing too early traps the oils in new asphalt and sealing too late means the surface is already oxidised. What the interval actually depends on, why the first coat waits six to twelve months, and what a sealer can and cannot fix.
Read articleNext step
We will survey the surface, mark the drip zones and the crack work, and propose a staging sequence that keeps the property trading throughout.
Markings are quoted separately and applied after the coating is finished.