Driveways
Lots and larger areas
Surface damage
Structural
Is it worth repairing
Crack work and materials
Timing and cost
Who we work for
Planning and budget
Maintenance plans
Reactive spending on asphalt is expensive because every item on the bill is something that has already failed. A cycle moves the money earlier, where the same budget buys prevention instead of repair.
Planned against reactive
The sequence of failure on asphalt is predictable. A crack opens, water reaches the base, the base softens, a section settles or a hole appears. Each stage costs several times the one before it.
Reactive spending always buys the later stages. By the time a surface looks bad enough to trigger a call, the cheap interventions have already been missed and what is left are patches and settled areas.
A plan buys the first stage repeatedly instead. The same money spent on sealing cracks and keeping water out delays everything downstream, and on a commercial site it also makes the spend predictable enough to put in a budget.
How a cycle runs
The surface is inspected on a schedule and the condition recorded, so changes are visible year to year rather than noticed once they are obvious.
New cracks are sealed each cycle while they are narrow. This is the item that does most of the work and costs least on the whole list.
Coating runs on a longer cycle than inspection, so a visit does not automatically mean a coat and you are not billed for one that is not due.
Anything heading towards a larger job is named with a rough timeframe, which is what lets a board or a household plan rather than react.
Who it suits
Commercial sites get the clearest benefit. A lot has more surface, harder use and a budget cycle that rewards predictable numbers, so planned spend is easier to approve than an unexpected repair bill.
Condo and property management sites add a second reason. A documented record of inspections and work is worth having when a board changes and somebody asks why the surface looks the way it does.
For a single driveway it is lighter: a reminder when sealing is due and a look at the cracks while we are there. The work itself is the same either way, and the interval is what the plan is really tracking. Managed sites use the written record most.
What a plan covers
Each item is quoted on its own; the plan is the schedule, not a bundle.
The item that recurs every cycle and does most of the preventive work for the least money on the list.
Learn moreCoating on its own interval, which is longer than the inspection cycle so a visit does not always mean a coat.
Learn moreThe commercial equivalent, usually on a shorter interval because of fuel and hydraulic drips.
Learn moreThe larger version for whole sites, sequencing surface work across several budget years.
Learn moreCommon questions
Annual plan: inspection every spring, crack sealing as needed, sealcoat every third year. One price and a reminder from them.
The plan has kept our lot in shape for a fraction of what a replacement would cost. The board renewed it without discussion.
They call before each visit and send a photo report after. We know what was done.
The plan was adjusted when they saw a section failing faster. Flexible, not a fixed script.
From the blog
Next step
We will inspect what you have, write down its condition, and set an interval that matches how the surface is actually used rather than a standard package.
Every item is quoted separately and approved before it happens.