How many vehicles a lot holds is decided by stall width and aisle width, not by its area. Striping is the cheap moment when both of those are still negotiable.
Measured, not traced
Lots drift. Each repaint follows the last one slightly out, and after three or four cycles the stalls are narrower at one end of a row than the other and an aisle has quietly lost a useful foot of width.
Snapping fresh lines from measured reference points costs very little more than tracing and corrects all of it at once. It is also the only way to know the stall count you are paying for is the stall count you actually have.
The measurements themselves come before the paint. Stall width, aisle width, traffic direction and the accessible spaces are settled on paper first, because paint is difficult to argue with afterwards. If the layout is changing, this is the moment, and it follows any coating rather than preceding it.
How marking runs
Current stalls are counted and measured and compared with what the site is meant to provide, which is usually where lost spaces turn up.
Widths, aisle dimensions, traffic flow and accessible spaces are settled in advance rather than decided by a crew working along a row.
Chalk lines are set from measured points rather than from the old faded paint, which is what takes the drift out of a lot that has been repainted for years.
Markings are applied and left to cure. Driving on wet paint tracks it across the whole lot and the clean-up is another visit.
Paint and timing
Surface condition decides more than paint quality. Markings applied to a sound sealed surface hold their edge for seasons; the same paint on an oxidised crumbling surface goes with the material it is sitting on.
Wear is never even. Entrances, aisle ends and anywhere vehicles turn under load lose their lines first, so a lot often needs touching up in those zones long before the rows need anything at all.
Timing follows the rest of the work. Markings are the last operation after coating or surface work, because anything applied earlier gets buried. Hardware such as wheel stops and bollards is normally fitted in the same closure.
Related work
Normally booked in the same closure.
Stalls, access aisles and the route to the entrance, set to the dimensions required rather than to what fits in the leftover space.
Learn morePosts, signs, wheel stops and protective bollards, anchored while the lot is already closed for marking.
Learn moreChanging the layout while the lines are gone, which is the only inexpensive moment to recover lost stalls.
Learn moreThe coat that precedes marking. Fresh lines applied before it are simply buried underneath.
Learn moreCommon questions
Lot striped the morning after sealcoating. Straight lines, crisp stencils, and the stall count matched the drawing.
They used a layout plan rather than eyeballing it. Every stall is the same width.
Fire lane, no-parking zones and the directional arrows all done in one pass. Nothing missed.
The paint was dry enough to park on by the afternoon, as they said.
From the blog
Next step
Send the stall count or let us measure it. You get a layout proposal, a price by the stall, and the accessible spaces checked against the requirement.
Most lots are marked overnight so trading is not interrupted.