Skip to main content
Booking Edmonton driveways and parking lots for the current paving season.
(613) 324-9141

Asphalt paving

Edmonton asphalt paving, driveways and parking lots

We lay new asphalt, resurface what is still sound, and repair the parts that are not. Every job starts with a look at the base and the drainage, because that is what decides how long the surface lasts, not the thickness of the top layer.

Written quote
Itemised
Season
Booking now
Most driveways
One day
A newly paved asphalt driveway with a compacted edge, in Edmonton

What we do

Paving, repair and sealcoating across Edmonton

Four kinds of work, and the honest answer about which one a surface needs is often the cheaper one.

All Services
1 day
Most residential driveways
6-12 mo
Before the first sealcoat
2-3 yrs
Between sealcoats after that
Written
Every quote, itemised

Where driveways fail

Asphalt almost never fails from the top down

A driveway that has broken up did not wear out on the surface. Water found a way under it, the base moved, and the asphalt above it lost its support. That is why a thick new top layer over a soft base buys a season or two and then opens again in the same places.

The pattern tells you which it is. Separate lines that run with the slope are shrinkage and movement, and crack filling keeps water out of them. A patch of small interlocking pieces is the base failing, and that section needs cutting out and rebuilding.

Water is the common cause in both. If rain stands on the surface instead of running off, the slope or the base has settled, and the drainage has to be fixed first. Sealing over a pond just gives you a sealed pond. The same logic decides whether to repair or replace.

Base rebuild
Interlocking cracks across an asphalt surface where the base below has failed
A compacted granular base graded before hot mix is laid

How a job runs

How your Edmonton paving job runs, first look to final pass

  1. Site visit and measure

    We measure the area, check the slope and look at where water goes. If the base is the problem, you hear that at this visit rather than after the work starts.

  2. Written, itemised quote

    Area, depth, base work and disposal are listed separately. That way a change to one of them is a visible change to the price rather than a surprise.

  3. Removal and base work

    The old surface comes out, the granular base is graded and compacted, and soft spots are dug out and replaced before anything is laid over them.

  4. Hot mix and compaction

    Asphalt is laid while it is hot and rolled in passes. Edges are compacted by hand where a roller cannot reach, because edges are where failure usually starts.

What a quote covers

What changes the number on a paving quote

Two driveways of the same size can be a long way apart in price, and the reason is almost always underneath. A surface that only needs the top layer removed and replaced is a different job from one where the base has to be dug out, and the quote should say which it is.

Depth matters for the same reason. A residential driveway and a lot that takes delivery trucks are not built the same way, so lot pricing is worked from the loads it carries rather than from the square footage alone.

Access changes it too. A machine that can reach the whole area works faster than one that cannot, and hand work around steps, posts and tight corners takes time that has to be in the number.

Where the surface is still sound, resurfacing costs a fraction of replacement because the base stays where it is. It is the cheaper answer often enough that it is worth asking about before agreeing to a full rebuild.

A measuring wheel run along a driveway edge while a quote is prepared
Repair or rebuild Decided by the base
Lots, not sq ft Priced by the load
Resurfacing Cheaper when sound

Common questions

What Edmonton owners ask before booking paving

The six that come up on almost every site visit.

Most Edmonton driveways are removed, re-based and paved inside one day. Wider lots and jobs that need the base rebuilt run into a second day. You stay off it for the rest of that day.
Light traffic the next morning is normal. Asphalt keeps curing for six to twelve months, so avoid parking a trailer leg or a jack stand on one spot through the first hot summer.
If the cracks are separate lines, repair is usually the cheaper answer. If the surface has broken into small interlocking pieces, the base underneath has failed and patching will not hold.
Wait six to twelve months. Fresh asphalt needs to release its oils first, and sealing too early traps them and leaves a soft surface that marks under tyres.
Standing water means the slope is wrong or the base has settled. It matters because water that sits will find the edges, get under the surface and take the base with it in a freeze.
Yes. Every Edmonton quote is itemised in writing after a site visit, with the depth, the area and the base work listed separately so you can see what changes the number.

Customer reviews

What Edmonton customers say

★★★★★ 4.9 · 127 reviews on Google
Read all reviews →
★★★★★

They cored the old driveway, found the base had failed, and quoted a replacement with the depth written down. The driveway has been through two winters without a crack.

Cara Q.
Leduc
★★★★★

Crack sealing and a sealcoat instead of the replacement another company pushed. Three years on, the driveway is fine.

Noah F.
Edmonton
★★★★★

Paving day went exactly as described: out by nine, down by three, driving on it in three days.

Priya R.
Beaumont
★★★★★

Quote was a range with reasons, the invoice sat inside it, and the crew swept the street before leaving.

Cole F.
Devon

From the blog

Reading before you book paving in Edmonton

All Paving Guides
Why Edmonton Driveways Fail at the Apron First Driveway Paving

October 26, 2026 8 min read

Why Edmonton Driveways Fail at the Apron First

The apron cracks first because the base under it was never compacted properly. This is not a surface problem. It is a foundation problem, and it decides whether resurfacing will hold.

Read article
Spring Potholes in Edmonton: Why Fall Prevention Matters Asphalt Repair

October 26, 2026 11 min read

Spring Potholes in Edmonton: Why Fall Prevention Matters

Every April, Edmonton's potholes reappear. They did not form overnight. They started as open cracks the previous fall, filled with water, and shattered when the freeze-thaw cycle began. The repair you avoid in October becomes the pothole you cannot avoid in spring.

Read article
Sealcoating Your Edmonton Driveway Before Winter Arrives Sealcoating

October 26, 2026 12 min read

Sealcoating Your Edmonton Driveway Before Winter Arrives

The autumn window for sealcoating closes fast in Edmonton. A sealed surface resists salt damage and plough wear on edges. Here's when to act and what changes if you wait.

Read article

Next step

Get a written paving quote for your Edmonton driveway or lot

A site visit takes about twenty minutes. You get the area, the depth, the base work and the disposal listed separately, so you can compare it against anything else you have been quoted.

Quotes are free and itemised. No work is booked from a phone call alone.